Reorganized SunEdison has disbursed $296.3 million since emergence and now expects to seek a final decree by end of 2027
ElevenFlo ·
SunEdison's plan reached effectiveness on December 29, 2017, and the reorganized debtor still files quarterly reports. The report for the quarter ended September 30, 2026 shows $248,964 disbursed in the quarter and $296.3 million since emergence, and puts the expected final-decree application at December 31, 2027 Dkt. 6704. The litigation trust's extended term runs through December 31, 2026, and the order leaves room for a further extension request Dkt. 6694.
Jump to section
The solar and wind developer filed in April 2016, confirmed a reorganization plan in July 2017 and emerged on December 29, 2017. A litigation trust is still resolving general unsecured claims, and the lead case remains open.
SunEdison's confirmed plan became effective on December 29, 2017 Dkt. 4495, and the reorganized debtor remains in post-confirmation administration. Its report for the quarter ended September 30, 2026, filed November 2, 2026, shows $248,964 in cash disbursements for the quarter and $296,318,507 since effectiveness Dkt. 6704. Cumulative professional fees and expenses stand at $173,306,230, all approved and paid, with none in the quarter. Administrative claims of $17,609,011 are reported as 100% paid; the report says that figure includes all administrative, secured and priority claims.
Two dates now frame the case. The litigation trust's term runs through December 31, 2026 under a December 2025 extension order, which does not bar a further extension request Dkt. 6694. Reports through the quarter ended March 31, 2026 expected an application for a final decree by December 31, 2026 Dkt. 6699. The June and September 2026 reports move that date to December 31, 2027, and neither is marked final Dkt. 6701 Dkt. 6704.
A failed growth push drained SunEdison's cash before the April 2016 filing
SunEdison began in 1959 as Monsanto Electronic Materials Company, a silicon wafer maker. It entered solar in 2009 by acquiring Sun Edison LLC, took the SunEdison name in 2013 and had divested its semiconductor business by June 2015. It formed two yieldcos and held majority stakes in both: TerraForm Power in March 2014 and TerraForm Global in August 2015. By December 2015 it had interconnected more than 1,197 renewable energy systems with 3.4 gigawatts of generating capacity Dkt. 4.
The first-day declaration traces the decline through 2015 and early 2016. It cites the failed Latin American Power acquisition, complications in the Vivint Solar merger and a mandatory $439 million margin loan prepayment that depleted cash. The company cut about 27% of its debtor workforce between September 2015 and March 2016. In early 2016 it received a Department of Justice subpoena about its financing activities and a notice of default from lenders under the prepetition first lien facility. It arranged $300 million of DIP financing from Deutsche Bank to pursue a restructuring that would de-lever its balance sheet Dkt. 4. SunEdison and its affiliates filed chapter 11 petitions on April 21, 2016, with about 1,665 employees Dkt. 1.
Recourse debt sat at the parent; most project debt had no or limited recourse to the debtors
The DIP financing motion lists the parent's funded debt on a pro forma basis as of April 14, 2016 Dkt. 26 · p. 23. The secured recourse debt was a $750 million first lien letter of credit facility, $500 million of Tranche A-1 and $225 million of Tranche A-2 second lien term loans, and $225 million of 5.0% second lien senior notes due July 2018. The disclosure statement adds that $678 million of third-party letters of credit were backed by the first lien facility, and about $145 million of them were drawn and unreimbursed at the petition date Dkt. 3314 · p. 49.
The same table puts unsecured recourse debt at $2.194 billion. That figure covers $215 million of exchangeable notes due 2020, issued by Seller Note, LLC and guaranteed by SunEdison, and six series of SunEdison convertible senior notes maturing from 2018 to 2025 Dkt. 26 · p. 23. A footnote describes the exchangeable notes as secured by a first priority lien on certain TerraForm Power Class B shares and Power LLC Class B units.
Below the parent, the table lists the $460 million First Reserve warehouse term loan and the $280 million TERP Private warehouse term loan as project-level non-recourse debt. The disclosure statement puts the debtors' project-level secured non-recourse debt at $3.8 billion as of the petition date. It says that debt sits in separate project entities and has no or limited recourse to the debtors Dkt. 3314 · p. 53. Identified debt is approximately $4,029,000,000 across 13 instruments with stated balances. That includes debt not limited to the debtors, such as the two warehouse loans. The filings do not establish a complete inventory, so the figure is not the group's total debt.
- Secured recourse debt
- Unsecured recourse debt
- First lien L/C facility: drawn, unreimbursed borrowingsSunEdison, Inc.$145M
- Second lien Tranche A-1 term loansSunEdison, Inc.$500M
- Second lien Tranche A-2 term loansSunEdison, Inc.$225M
- 5.0% second lien senior notes due 2018SunEdison, Inc.$225M
- Exchangeable notes due 2020Seller Note, LLC; guaranteed by SunEdison, Inc.$215M
- Convertible senior notes due 2018SunEdison, Inc.$256M
- Convertible senior notes due 2020SunEdison, Inc.$488M
- Convertible senior notes due 2021SunEdison, Inc.$289M
- Convertible senior notes due 2022SunEdison, Inc.$347M
- Convertible senior notes due 2023SunEdison, Inc.$279M
- Convertible senior notes due 2025SunEdison, Inc.$320M
Show the numbers
| Debt | Obligor | Principal |
|---|---|---|
| First lien L/C facility: drawn, unreimbursed borrowings | SunEdison, Inc. | $145M |
| Second lien Tranche A-1 term loans | SunEdison, Inc. | $500M |
| Second lien Tranche A-2 term loans | SunEdison, Inc. | $225M |
| 5.0% second lien senior notes due 2018 | SunEdison, Inc. | $225M |
| Exchangeable notes due 2020 | Seller Note, LLC; guaranteed by SunEdison, Inc. | $215M |
| Convertible senior notes due 2018 | SunEdison, Inc. | $256M |
| Convertible senior notes due 2020 | SunEdison, Inc. | $488M |
| Convertible senior notes due 2021 | SunEdison, Inc. | $289M |
| Convertible senior notes due 2022 | SunEdison, Inc. | $347M |
| Convertible senior notes due 2023 | SunEdison, Inc. | $279M |
| Convertible senior notes due 2025 | SunEdison, Inc. | $320M |
Source: DIP financing motion Dkt. 26 · p. 23; solicitation version of the first amended disclosure statement Dkt. 3314 · p. 49
Two DIP facilities refinanced the case and rolled up prepetition secured debt
The debtors sought DIP financing and use of cash collateral on the petition date Dkt. 26, and the court entered an interim order on April 26, 2016 Dkt. 87. Westchester Fire Insurance Company objected Dkt. 169, as did the creditors' committee Dkt. 296. An ad hoc group of convertible noteholders objected to final first-day orders that would spend DIP borrowings and to the debtors' motion for an examiner Dkt. 285. The final order followed on June 9, 2016 Dkt. 523.
The original facility provided $300 million of new money term loans from Deutsche Bank AG New York Branch, which also served as agent: $90 million at closing and $210 million in one delayed draw. Pricing was the Eurocurrency rate plus 9.00% or the base rate plus 8.00%, with a 1.50% upfront fee and a 0.50% unused fee Dkt. 525. The motion also proposed a $350 million roll-up of second lien debt as Tranche B loans Dkt. 26. Under the final order, the loans matured one year after closing, or earlier on plan consummation or a sale of substantially all assets. Remaining letter of credit obligations were exchanged for Tranche A roll-up loans: $145,342,368.21 of Tranche A-1 loans for prepetition drawn letters of credit and $184,216,016.19 of Tranche A-2 loans for postpetition draws, $329,558,384.40 in all. The order set a challenge period of 75 days after entry with a $175,000 investigation budget. It also required an acceptable plan and disclosure statement within 120 days of the petition date Dkt. 523.
In April 2017 the debtors moved to replace the facility Dkt. 2732. The committee filed a limited objection. It alleged that the second lien lenders had carved a $300 million slice out of approximately $950 million of prepetition second lien obligations, rolled it into the existing DIP and accrued pay-in-kind interest on it to assert as administrative expenses Dkt. 2802 · p. 17. It argued that even the rolled-up claims may be undersecured, given its pending adversary proceeding and its objections to original issue discount Dkt. 2802 · p. 16. The court let the committee file the objection under seal Dkt. 2803.
The May 1, 2017 order authorized up to $640 million of replacement new money term loans. Cantor Fitzgerald Securities, LLC served as agent. The lenders included Bank of America, Cyrus Capital Partners, Deutsche Bank, Goldman Sachs Lending Partners, Luxor Capital, Merced Capital, Sound Point Capital Management, SVP and Tennenbaum Capital Partners Dkt. 2880. Proceeds repaid the existing DIP obligations, including the Tranche A roll-up loans and letter of credit borrowings, and made a $52,878,660.89 mandatory repayment of roll-up loans. The second lien roll-up loans continued as a junior tranche: $370,149,838.03 at closing and $317,271,177.14 after that repayment, with pay-in-kind interest at the Eurocurrency rate plus 12.00%. The order set no new challenge period. The claims stipulations bind all parties, except as to the committee's filed adversary proceeding and the original issue discount objections. The second lien parties consented to the use of cash collateral.
The plan paid the DIP at emergence and left unsecured recoveries to a litigation trust
The debtors filed their joint plan Dkt. 2671 and disclosure statement Dkt. 2672 on March 28, 2017. They modified the plan in May and June Dkt. 3218 Dkt. 3265 and filed the solicitation version of the first amended disclosure statement on June 12, 2017. That version proposed allowing the second lien claims in Classes 1A and 1B at $625.2 million Dkt. 3314 · p. 247 and the 2023 convertible senior notes claims at $281,870,349.58 Dkt. 3314 · p. 249. The court entered findings of fact, conclusions of law and an order confirming the second amended plan on July 28, 2017 Dkt. 3735.
Under the confirmation order, allowed replacement DIP term loan claims were to be paid in full in cash on the effective date. Tranche B roll-up loan claims were also to be paid on the effective date. The exception was if the TERP cash election alternative was elected and transaction cash fell short, in which case those claims could be reinstated Dkt. 3735. The debtors filed notice of effectiveness on December 29, 2017 Dkt. 4495. The same day, the court granted the debtors' second motion under section 510(b). That order subordinated and reclassified claims based on the purchase or sale of securities of the debtors or their affiliates Dkt. 4494.
Asset dispositions ran through and after confirmation. An October 2016 order approved the transfer, cancellation and conversion of shares in Enki Technology, Inc. under the de minimis asset sale procedures Dkt. 1468. An October 2017 order approved bidding procedures for the sale of the debtors' Texas property, with a break-up fee and expense reimbursement for a stalking horse purchaser Dkt. 4111. A March 2018 consent order let the debtors assign certain disputed contracts to Complete Solar, Inc. under an amendment to their asset purchase agreement Dkt. 4705.
The litigation trust has recovered more than $130 million and paid about 3.1% on allowed unsecured claims
The litigation trust, with Drivetrain, LLC as trustee, was established on December 29, 2017 to prosecute causes of action and reconcile general unsecured claims. The trust moved to extend its term on December 4, 2025. In that motion it reported recoveries of more than $130 million and distributions of approximately 3.1% of allowed general unsecured claim amounts Dkt. 6692. It said it still had to resolve approximately 280 general unsecured claims by settlement or objection and conclude its last pending adversary proceeding. It also had to collect on default judgments, administer settlements paid in installments and make another distribution, which it then projected for the first quarter of 2026.
The motion lists default judgments under collection against UCPC Limited ($1,725,701.48), Synergy Innovations PTE Ltd. ($961,782.25) and Prime Solar Source, LLC ($849,060.50). At the most recent quarter end, the trust's accounts at Wells Fargo Private Bank held $7,634,661 in preference collections, $13,957,061 for litigation expenses and other uses, and $2,846,172 of additional compensation. The trust was seeking a tax opinion or an IRS private letter ruling so that the extension would not jeopardize its treatment as a liquidating trust for federal income tax purposes Dkt. 6692.
The court's December 16, 2025 order extended the term through December 31, 2026. The extension takes effect when the trust files notice that it has received a favorable private letter ruling or opinion of counsel under section 10.1(a) of the trust agreement. The order is without prejudice to further extension requests by the trust or the debtors Dkt. 6694.
The lead case stays open while the reorganized debtor files quarterly reports
Other cases in the group have been wound down. The docket carries an August 10, 2018 order of final decree authorizing the closing of a case Dkt. 9. On February 12, 2024 the court granted the debtors' motion to dismiss the chapter 11 case of Everstream Holdco Fund I, LLC (Case No. 16-12058) Dkt. 6648. The lead case remains open.
Quarterly disbursements by the reorganized debtor were:
- $212,854 for the quarter ended June 30, 2025 Dkt. 6689
- $4,793,639 for September 30, 2025 Dkt. 6691
- $340,936 for December 31, 2025 Dkt. 6698
- $433,798 for March 31, 2026 Dkt. 6699
- $248,964 for September 30, 2026 Dkt. 6704
Cumulative disbursements since effectiveness rose from $289,999,002 at June 30, 2025 to $296,318,507 at September 30, 2026. The reports from June 2025 through June 2026 show nothing paid on the separate secured, priority and general unsecured claim lines Dkt. 6701. The $17,609,011 administrative figure, reported as 100% paid, includes administrative, secured and priority claims. General unsecured distributions run through the litigation trust.
Sources
- Dkt. 1Chapter 11 Voluntary Petition for Individual. Order for Relief Entered. Filed by Jay M. Goffman of Skadden, Arps, Slate, Meagher & Flom LLP on behalf of SunEdison, Inc..Filed Apr 21, 2016Apr 21, 2016
- Dkt. 4First Day DeclarationFiled Apr 21, 2016Apr 21, 2016
- Dkt. 9Order of Final Decree Authorizing Closing Of Case Signed On 8/10/2018.Filed Aug 10, 2018Aug 10, 2018
- Dkt. 26Motion to Authorize Debtors' Motion for Interim and Final Orders (I) Authorizing Debtors (A) to Obtain Postpetition Financing Pursuant to Bankruptcy Code Sections 105, 361, 362, 364(c)(1), 364(c)(2), 364(c)(3), 364(d)(1), And 364(e) and (B) to Utilize Cash Collateral Pursuant to Bankruptcy Code Section 363, (II) Granting Adequate Protection to Prepetition Secured Parties Pursuant to Bankruptcy Code Sections 361, 362, 363 and 364 and (III) Scheduling Final Hearing Pursuant to Bankruptcy Rules 4001(b) and (c) filed by Jay M. Goffman on behalf of SunEdison, Inc. with hearing to be held on 4/22/2016 at 11:00 AM at Courtroom 723 (SMB) Responses due by 4/22/2016,.Cited at p. 23 · Filed Apr 21, 2016Apr 21, 2016
- Dkt. 87Interim Order Signed On 4/26/2016. Re: (I) Authorizing Debtors To (A) Obtain Senior Secured, Superpriority, Postpetition Financing Pursuant To Bankruptcy Code Sections 105, 361, 362, 364(C)(1), 364(C)(2), 364(C)(3), 364(D)(1), And 364(E) And (B) Utilize Cash Collateral Pursuant To Bankruptcy Code Section 363, (II) Granting Adequate Protection To Prepetition Secured Parties Pursuant To Bankruptcy Code Sections 361, 362, 363 And 364 And (III) Scheduling Final Hearing Pursuant To Bankruptcy Rules 4001(B) And (C) (related document(s)26)Filed Apr 26, 2016Apr 26, 2016
- Dkt. 169Objection to Motion for Interim and Final Orders (I) Authorizing Debtors (A) to Obtain Postpetition Financing Pursuant to Bankruptcy Code Sections 105, 361, 362, 364(c)(1), 364(c)(2), 364(c)(3), 364(d)(1), And 364(e) and (B) to Utilize Cash Collateral Pursuant to Bankruptcy Code Section 363, (II) Granting Adequate Protection to Prepetition Secured Parties Pursuant to Bankruptcy Code Sections 361, 362, 363 and 364 and (III) Scheduling Final Hearing Pursuant to Bankruptcy Rules 4001(b) and (c) (related document(s)26) filed by Louis A. Modugno on behalf of Westchester Fire Insurance Company. (Attachments: # 1 Certificate of Service)Filed May 3, 2016May 3, 2016
- Dkt. 285Omnibus Objection to Motion / Omnibus Objection of Ad Hoc Group of SunEdison, Inc. Convertible Unsecured Noteholders to (I) Final Orders Relating to Certain First Day Motions Seeking to Spend Borrowings Under DIP Financing and (II) Debtors' Motion for Order Appointing Examiner (related document(s)10, 7, 9, 8, 11) filed by J. Christopher Shore on behalf of Ad Hoc Group of SunEdison, Inc. Convertible Unsecured Noteholders. (Attachments: # 1 Exhibit A)Filed May 13, 2016May 13, 2016
- Dkt. 296Objection : Official Committee of Unsecured Creditors' Objection to Debtors' Motion for Interim and Final Orders (I) Authorizing Debtors to (a) Obtain Postpetition Financing Pursuant to Bankruptcy Code Sections 105, 361, 362, 364(c)(1), 364(c)(2), 364(c)(3), 364(d)(1) and 364(e) and (b) to Utilize Cash Collateral Pursuant to Bankruptcy Code Section 363, (II) Granting Adequate Protection to Prepetition Secured Parties Pursuant to Bankruptcy Code Sections 361, 362, 363, and 364 and (III) Scheduling Final Hearing Pursuant to Bankruptcy Rules 4001(b) and (c) (related document(s)26) filed by Matthew Scott Barr on behalf of Official Committee of Unsecured Creditors.Filed May 16, 2016May 16, 2016
- Dkt. 523Final Order Signed On 6/9/2016 Re: (I) Authorizing Debtors To (A) Obtain Senior Secured, Superpriority, Postpetition Financing Pursuant To Bankruptcy Code Sections 105, 361, 362, 364(C)(1), 364(C)(2), 364(C)(3), 364(D)(1), And 364(E) And (B) Utilize Cash Collateral Pursuant To Bankruptcy Code Section 363, And (II) Granting Adequate Protection To Prepetition Secured Parties Pursuant To Bankruptcy Code Sections 361, 362, 363 And 364(Related Doc # 26) .Filed Jun 9, 2016Jun 9, 2016
- Dkt. 525Statement Notice of Filing of Amendment No. 2 to Senior Secured Superpriority Debtor-In-Possession Credit Agreement (related document(s)523, 87, 487, 26) filed by Jay M. Goffman on behalf of SunEdison, Inc., et al.,.Filed Jun 9, 2016Jun 9, 2016
- Dkt. 1468Order signed on 10/25/2016 Authorizing And Approving Transfer, Cancellation, And Conversion Of Shares In Enki Technology, Inc. As De Minimis Assets In Accordance With De Minimis Asset Sale Procedures Order. (related document(s)1394)Filed Oct 25, 2016Oct 25, 2016
- Dkt. 2671Chapter 11 Plan Joint Plan Of Reorganization Of SunEdison, Inc. And Its Debtor Affiliates filed by J. Eric Ivester on behalf of SunEdison, Inc., et al.,.Filed Mar 28, 2017Mar 28, 2017
- Dkt. 2672Disclosure Statement (related document(s)2671) filed by J. Eric Ivester on behalf of SunEdison, Inc., et al.,.Filed Mar 28, 2017Mar 28, 2017
- Dkt. 2732Motion to Approve Debtor in Possession Financing Debtors' Motion For Order (I) Authorizing Debtors (A) To Obtain Replacement Postpetition Financing Pursuant To Bankruptcy Code Sections 105, 361, 362, 364(c)(1), 364(c)(2), 364(c)(3), 364(d)(1), And 364(e), (B) To Utilize Cash Collateral Pursuant To Bankruptcy Code Section 363, And (C) To Repay Existing Postpetition Financing Pursuant To Bankruptcy Code Section 363(b), (II) Granting Adequate Protection To Prepetition Secured Parties Pursuant To Bankruptcy Code Sections 361, 362, 363 And 364 And (III) Scheduling Hearing Pursuant To Bankruptcy Rules 4001(b) And (c) filed by J. Eric Ivester on behalf of SunEdison, Inc., et al., with hearing to be held on 4/25/2017 at 02:00 PM at Courtroom 723 (SMB) Responses due by 4/18/2017,.Filed Apr 4, 2017Apr 4, 2017
- Dkt. 2802Objection Official Committee of Unsecured Creditors' Limited Objection to Debtors Motion For Order (I) Authorizing Debtors (A) To Obtain Replacement Postpetition Financing Pursuant To Bankruptcy Code Sections 105, 361, 362, 364(c)(1), 364(c)(2), 364(c)(3), 364(d)(1), And 364(e), (B) To Utilize Cash Collateral Pursuant To Bankruptcy Code Section 363, And (C) To Repay Existing Postpetition Financing Pursuant To Bankruptcy Code Section 363(b), (II) Granting Adequate Protection To Prepetition Secured Parties Pursuant To Bankruptcy Code Sections 361, 362, 363 And 364 And (III) Scheduling Hearing Pursuant To Bankruptcy Rules 4001(b) And (c) (related document(s)2733, 2798, 2734, 2772, 2732, 2774) filed by Benjamin Sauter on behalf of Official Committee of Unsecured Creditors. with hearing to be held on 4/25/2017 at 02:00 PM at Courtroom 723 (SMB) Objections due by 4/18/2017,Filed Apr 18, 2017Apr 18, 2017
- Dkt. 2803Order signed on 4/18/2017 Authorizing Filing of the Official Committee of Unsecured Creditors' Objection to Debtors' Replacement DIP Financing Motion Under Seal. (related document(s)2732)Filed Apr 18, 2017Apr 18, 2017
- Dkt. 2880So Ordered Order Signed On 5/1/2017 Re: (I) Authorizing Debtors To (A) Obtain Senior Secured,Superpriority, Replacement Postpetition Financing Pursuant To Bankruptcy CodeSections 105, 361, 362, 364(C)(1), 364(C)(2), 364(C)(3), 364(D)(1), And 364(E),And (B) Utilize Cash Collateral Pursuant To Bankruptcy Code Section 363, (II)Authorizing Use Of Proceeds To Repay Existing Senior Secured Superpriority Postpetition Financing, And (III) Granting Adequate Protection To PrepetitionSecured Parties Pursuant To Bankruptcy Code Sections 361, 362, 363 And 364(Related Doc # 2732) .Filed May 1, 2017May 1, 2017
- Dkt. 3218Chapter 11 Plan Notice Of Filing Of Proposed Modifications To Joint Plan Of Reorganization Of SunEdison, Inc. And Its Debtor Affiliates (related document(s)2671) filed by J. Eric Ivester on behalf of SunEdison, Inc., et al.,.Filed May 26, 2017May 26, 2017
- Dkt. 3265Chapter 11 Plan Notice Of Filing Of Further Proposed Modifications To Joint Plan Of Reorganization Of SunEdison, Inc. And Its Debtor Affiliates (related document(s)2671, 3218) filed by J. Eric Ivester on behalf of SunEdison, Inc., et al.,.Filed Jun 2, 2017Jun 2, 2017
- Dkt. 3314Amended Disclosure Statement Amended Notice Of Filing Of Solicitation Version Of First Amended Disclosure Statement For First Amended Joint Plan Of Reorganization Of SunEdison, Inc. And Its Debtor Affiliates (related document(s)2672, 3217, 3313, 3290, 3266, 3309) filed by J. Eric Ivester on behalf of SunEdison, Inc., et al.,.Filed Jun 12, 2017Jun 12, 2017
- Dkt. 3735Findings Of Fact, Conclusions Of Law And Order Confirming Second Amended Plan Of Reorganization Of Sunedison, Inc. And Its Debtor Affiliates Signed On 7/28/2017.Filed Jul 28, 2017Jul 28, 2017
- Dkt. 4111Order Signed On 10/5/2017 Re: (A) Approving (I) Bidding Procedures And (II) The Time, Date, Place And Form Of Notice For Auction And Sale Hearing To Consider The Debtors Sale Of The Texas Property, And (B) Approving Break-Up Fee And Expense Reimbursement With Stalking Horse Purchaser(Related Doc # 4031) . with hearing to be held on 10/24/2017 at 10:00 AM at Courtroom 723 (SMB)Filed Oct 5, 2017Oct 5, 2017
- Dkt. 4494Order Signed On 12/29/2017 Re: Granting Debtors Second Motion, Pursuant To Sections 105(A) And 510(B) Of The Bankruptcy Code And The Terms And Conditions Of The Debtors Confirmed Plan oF Reorganization, For Entry Of An Order Subordinating And Reclassifying Claims Based On The Purchase Or Sale Of Securities Of The Debtors Or Their Affiliates(Related Doc # 4217) .Filed Dec 29, 2017Dec 29, 2017
- Dkt. 4495Statement Notice Of Effective Date Of Confirmed Second Amended Joint Plan Of Reorganization Of SunEdison, Inc. And Its Debtor Affiliates (related document(s)3735) filed by J. Eric Ivester on behalf of SunEdison, Inc., et al.,.Filed Dec 29, 2017Dec 29, 2017
- Dkt. 4705Consent Order Signed On 3/9/2018 Re: Authorizing The Debtors To Assign Their Right, Title And Interest In And To Certain Disputed Contracts To Complete Solar, Inc., Pursuant To Amendment No.1 To Asset Purchase Agreement With Complete Solar, (related document(s)3735, 4552).Filed Mar 9, 2018Mar 9, 2018
- Dkt. 6648Order Signed on 2/12/2024 Granting the Debtors' Motion to Dismiss the Chapter 11 Case of Everstream Holdco Fund I, LLC (Case No. 16-12058). (Related Doc # 6644)Filed Feb 12, 2024Feb 12, 2024
- Dkt. 6689Post-Confirmation Report (Q2 2025)Filed Jul 30, 2025Jul 30, 2025
- Dkt. 6691Post-Confirmation Report (Q3 2025)Filed Oct 30, 2025Oct 30, 2025
- Dkt. 6692Motion to Extend Litigation Trust TermFiled Dec 4, 2025Dec 4, 2025
- Dkt. 6694Order Extending Litigation Trust TermFiled Dec 16, 2025Dec 16, 2025
- Dkt. 6698Post-Confirmation Report (Q4 2025)Filed Jan 23, 2026Jan 23, 2026
- Dkt. 6699Post-Confirmation Report (Q1 2026)Filed May 4, 2026May 4, 2026
- Dkt. 6701SunEdison Quarterly ReportFiled Jul 31, 2026Jul 31, 2026
- Dkt. 6704Chapter 11 Post-Confirmation Report for the Quarter Ending: 09/30/2026 Filed by Brian F. Moore on behalf of SunEdison, Inc., et al.,.Filed Nov 2, 2026Nov 2, 2026