TPI Composites Bankruptcy: Plants Sold, Parent Renamed TWD Composites, $38.5 Million in Administrative Claims Pending
ElevenFlo ·
TPI Composites’ liquidating plan was confirmed July 1, 2026 and took effect July 2, after its plants were sold to Vestas and ECP Blade Holdings Dkt. 1013 · p. 1Dkt. 1017 · p. 2. A July 9 final decree closed every case except the parent, now TWD Composites, Inc. Dkt. 1144 · pp. 2, 4. Through September 30, secured lenders had received $5 million and unsecured creditors and shareholders nothing Dkt. 1145 · p. 7. GE Renewables and LM Wind now seek about $38.5 million in administrative claims Dkt. 1149 · p. 1Dkt. 1150 · p. 1.
Jump to section
Where the TPI Composites bankruptcy stands
TPI Composites, Inc., the Scottsdale, Arizona wind-blade manufacturer, filed chapter 11 in the U.S. Bankruptcy Court for the Southern District of Texas on August 11, 2025, together with 21 affiliates, under lead case 25-34655 Dkt. 1Dkt. 928 · p. 1. The case did not reorganize the company. Its operating businesses were sold: TPI Mexico V and TPI Mexico VI went to a Vestas affiliate, and the remaining U.S. and Mexico blade business went to ECP Blade Holdings, LLC Dkt. 929 · p. 58Dkt. 928 · p. 1Dkt. 778 · p. 1Dkt. 1013 · p. 39.
The liquidating plan for the remaining debtors was confirmed at a July 1, 2026 hearing and took effect on July 2, 2026 Dkt. 1008Dkt. 1013 · p. 1Dkt. 1017 · p. 2. Final decrees entered June 30 and July 9, 2026 closed every affiliate case. Only the parent’s case remains open, and the parent was renamed TWD Composites, Inc. as of July 29, 2026 Dkt. 998Dkt. 1025Dkt. 1144 · pp. 2, 4. In the filings it is the WindDown Co, which reconciles claims and makes plan distributions alongside a separate trust for general unsecured creditors Dkt. 1144 · p. 3Dkt. 1013 · p. 53.
What remains open is the claims process. Responses to the WindDown Co’s third omnibus claims objection are due at 5:00 p.m. Central Time on November 19, 2026 Dkt. 1152 · p. 3. On November 6, 2026, GE Renewables North America, LLC and four LM Wind Power entities filed applications asking the court to allow and order payment of $32,816,000 and $5,699,649.88 in administrative expenses, about $38.5 million combined Dkt. 1149 · pp. 1, 5Dkt. 1150 · p. 1. The available entries through November 17, 2026 show no order on either application.
| Item | Status |
|---|---|
| Court and case | U.S. Bankruptcy Court, Southern District of Texas, Houston Division, No. 25-34655 Dkt. 1144 · p. 1 |
| Petition date | August 11, 2025 Dkt. 1 |
| Vestas sale (TPI Mexico V and VI) | Sale order and plan confirmation May 21, 2026; plan effective June 15, 2026; cases closed by the June 30, 2026 final decree Dkt. 928 · p. 1Dkt. 929 · p. 15Dkt. 980Dkt. 998Dkt. 1144 · p. 2 |
| ECP sale | Sale order signed March 16, 2026; $20,000,000 base cash price before adjustments Dkt. 778 · p. 1Dkt. 1013 · p. 39 |
| Liquidating plan for the remaining debtors | Confirmed July 1, 2026; effective July 2, 2026 Dkt. 1013 · p. 1Dkt. 1017 · p. 2 |
| Open cases | Only TWD Composites, Inc., the former TPI Composites, Inc. Dkt. 1144 · pp. 2, 4 |
| Paid through September 30, 2026 | $5,000,000 to senior secured term loan holders; $0 on administrative, priority and general unsecured claims and equity Dkt. 1145 · pp. 7, 13 |
| Next deadline | Third omnibus objection responses due 5:00 p.m. Central Time, November 19, 2026 Dkt. 1152 · p. 3 |
| Pending requests | GE Renewables North America ($32,816,000) and LM Wind ($5,699,649.88) administrative expense applications Dkt. 1149 · p. 5Dkt. 1150 · p. 1 |
How the liquidating plan was confirmed
At the July 1, 2026 combined hearing, the court approved the disclosure statement on a final basis and confirmed the Amended Joint Chapter 11 Plan of Liquidation of TPI Composites, Inc. and Certain of Its Affiliated Debtors, filed as Dkt 931, for the 20 debtors known in the case as the RemainCo Debtors Dkt. 1008Dkt. 1013 · p. 1Dkt. 931. The court had conditionally approved that disclosure statement on May 21, 2026 and noticed the combined hearing on May 26 Dkt. 927Dkt. 937.
The confirmation order records that Class 3, the senior secured term loan, voted to accept at every RemainCo debtor. Class 4 general unsecured claims accepted or were deemed to accept at all but six debtors, including the parent Dkt. 1013 · p. 7. The court confirmed the plan over the non-accepting classes under section 1129(b) of the Bankruptcy Code and found that the plan met the best-interests test Dkt. 1013 · p. 8. It treated the third-party releases as consensual because holders were given an opt-out or opt-in choice Dkt. 1013 · p. 9.
The debtors’ July 2, 2026 notice states that all conditions to the plan were satisfied or waived and that the plan became effective that day Dkt. 1017 · p. 2. The same notice set August 31, 2026 as the deadline for administrative expense requests and August 1, 2026 as the bar date for claims arising from contracts rejected under the plan Dkt. 1017 · p. 2.
Who gets paid under the plan
Class 3 senior secured term loan claims are allowed in an amount of no less than $456.8 million, the approximate principal of the senior secured term loan Dkt. 1013 · pp. 45, 52. Holders share pro rata in Excess Sale Proceeds, remaining reserves and the Surplus Senior Claims Recovery Pool Cash Dkt. 1013 · p. 52. Class 4 general unsecured creditors receive pro rata GUC Trust Interests, a trust shared with general unsecured creditors of TPI Mexico V and TPI Mexico VI Dkt. 1013 · p. 52. The GUC Trust agreement was filed with the second plan supplement for the TPI Mexico V and VI plan Dkt. 915.
For Class 6 equity, a Single Share is issued to the WindDown Agent as custodian, and holders of existing equity neither receive nor retain any property unless all allowed claims are satisfied in full Dkt. 1013 · p. 53. The plan also established the WindDown Co to wind down the estates Dkt. 1013 · p. 53.
Unsecured recoveries also depend on the December 2025 settlement among the debtors, the official committee of unsecured creditors and Oaktree, the senior lender. The settlement does not pay a fixed sum. Oaktree turns over a share of the cash it later recovers on its claims: it keeps all of the first $89.5 million, 95% of amounts from $89.5 million to $125 million, 90% of amounts from $125 million to $290 million, and all amounts above $290 million, with the rest going to holders of allowed general unsecured claims Dkt. 553 · pp. 5, 6. On that schedule the unsecured share reaches at most a net $18.275 million. A separate $1 million of upfront cash funds the GUC Trust’s administration Dkt. 553 · p. 5. The settlement was approved on December 18, 2025 Dkt. 514Dkt. 553.
Money reported through September 30, 2026
The WindDown Co’s post-confirmation report for July 1 through September 30, 2026, filed October 21, reports $15,900,352 in cash disbursements since the effective date Dkt. 1145 · pp. 2, 12. That figure includes the July 2 funding of the professional fee escrow and a July 9 distribution of $5,000,000 of Excess Sale Proceeds to holders of allowed senior secured term loan claims Dkt. 1145 · pp. 12, 13. The report lists $17,414,340 in professional fees and expenses for the debtors and committees, all paid Dkt. 1145 · p. 7.
The report’s recovery table shows $5,000,000 paid on secured claims and $0 paid on administrative, priority and general unsecured claims and on equity interests Dkt. 1145 · p. 7. It enters $732,519 as the anticipated administrative payment but says total anticipated plan payments are unknown and depend on claims reconciliation Dkt. 1145 · pp. 7, 12. It also says the WindDown Co cannot predict when it will apply for a final decree closing its own case Dkt. 1145 · p. 13.
The $38.5 million administrative claim requests
GE Renewables North America, LLC asks the court to allow and order payment of $32,816,000 in administrative expenses: $23,000,000 against TPI MX I ($7,000,000 of bonus payments and $16,000,000 of liquidity payments through February 12, 2026), $6,000,000 against TPI MX III, and $3,816,000 against TPI Iowa after a $2,184,000 credit for blades delivered from January 1 to February 12, 2026 Dkt. 1149 · pp. 4, 5. GE says these claims were already allowed by earlier court orders, so in its view no extension of the August 31 administrative deadline was legally required, though the WindDown Co agreed to extend it for the GE parties through November 6, 2026 Dkt. 1149 · pp. 4, 5. GE also says liquidity it supplied after February 12, 2026, including $15,000,000 allowed under an earlier order, is reimbursed by the buyer under a separate agreement and is not part of this request Dkt. 1149 · p. 4.
Four LM Wind Power entities, which supplied bushings and other blade components, ask for $5,699,649.88, covering post-petition deliveries and more than $519,000 of claims for goods received in the 20 days before the filing Dkt. 1150 · pp. 1, 2. LM Wind says it and the debtors agreed on that amount after a reconciliation but could not agree on the overall terms of a settlement Dkt. 1150 · p. 3. It cites the plan’s requirement that allowed administrative expenses be paid in cash, in full, about 30 days after allowance Dkt. 1150 · p. 5.
Each application gives parties 21 days from service to respond Dkt. 1149 · p. 1Dkt. 1150 · p. 1. Together the two requests are far larger than the $732,519 administrative figure in the September 30 report Dkt. 1145 · p. 7. The available entries through November 17, 2026 show no response or ruling on either request.
Claims objections and deadlines
Kroll Restructuring Administration LLC is the claims and noticing agent Dkt. 28Dkt. 1144 · p. 4. The general bar date was October 22, 2025 and the governmental bar date February 9, 2026. The register holds 616 filed proofs of claim, and about 625 more claims were scheduled by the debtors Dkt. 1144 · pp. 4, 5. On September 21, 2026, the court approved procedures for objecting to claims on an omnibus basis Dkt. 1129Dkt. 1152 · p. 2.
The WindDown Co and the GUC Trust filed a first omnibus objection on August 20, 2026, with responses due September 21 Dkt. 1094Dkt. 1153 · pp. 1, 2. On November 17, 2026, they withdrew it as to two claims whose holders had objected and submitted a revised proposed order Dkt. 1153 · p. 2. The WindDown Co filed a second omnibus objection, aimed at claims it says carry no liability, on October 6, 2026 Dkt. 1140.
The third omnibus objection, filed October 20, 2026, asks the court to disallow, reduce or reclassify claims it describes as misclassified, duplicated across two debtors, wholly or partly no longer owed, or lacking documentation Dkt. 1144 · p. 1Dkt. 1152 · p. 2. It targets only secured, administrative and priority amounts. Unsecured portions are not affected, and the GUC Trustee reserves its rights on them Dkt. 1144 · p. 6. After an incomplete first notice, a supplemental notice set the response deadline at 5:00 p.m. Central Time on November 19, 2026 Dkt. 1152 · p. 3. The available entries through November 17, 2026 show no order on any of the three omnibus objections.
How the plants were sold
The court approved bid procedures on September 30, 2025 Dkt. 288. For TPI Mexico V and TPI Mexico VI, the debtors designated a qualified bidder and cancelled the auction on December 12, 2025 Dkt. 521. Their separate plan issued all reorganized equity of the two companies to Vestas America Holding, Inc., an affiliate of Vestas Wind Systems A/S, under a March 4, 2026 equity commitment agreement Dkt. 903 · p. 23Dkt. 929 · pp. 15, 42, 58. The court confirmed that plan and approved a related Mexico asset sale to the Vestas buyer on May 21, 2026 Dkt. 929Dkt. 928 · p. 1. The plan took effect June 15 and the two cases closed by a June 30, 2026 final decree Dkt. 980Dkt. 998Dkt. 1144 · p. 2.
For the rest of the business, the debtors cancelled a second auction on February 12, 2026 Dkt. 667. The court approved the sale to ECP Blade Holdings, LLC on March 16, 2026 Dkt. 778 · p. 1. Under the March 6, 2026 purchase agreement, ECP bought the equity of TPI Blade Services Europe S.L.U., TPI Composites, S. de R.L. de C.V. and TPI Blade Services LATAM S.A. de C.V., certain assets of non-debtor TPI Composites Denmark ApS, and substantially all of the debtors’ U.S. and Mexico business assets other than the equity of affiliated debtors, for a base cash price of $20,000,000 before adjustments Dkt. 1013 · p. 39. GE’s November application refers to the buyer as ECP Blade Holdings LLC, now known as TPI Composites Holdings, LLC Dkt. 1149 · p. 4.
How TPI reached chapter 11
According to the first-day declaration, TPI issued $350 million of preferred stock to affiliates of Oaktree Capital Management on November 8, 2021 Dkt. 14 · p. 4. In the third quarter of 2023, Oaktree exchanged $436 million of that preferred equity into a $393 million senior secured term loan, with $43 million of accrued dividends exchanged into common stock Dkt. 14 · p. 6. The declaration describes the company’s losses in Mexico, inflation and policy uncertainty in the wind market as the background to the filing Dkt. 14 · pp. 4, 5, 6.
The senior secured lenders provided debtor-in-possession financing of up to $27.5 million of new money and up to $55 million of roll-up loans Dkt. 14 · p. 8Dkt. 37 · p. 3. The court approved it on an interim basis on August 13, 2025 and finally on October 14, 2025 Dkt. 73Dkt. 373. At filing, the debtors expected a restructuring that would make the senior secured lenders owners of a reorganized company Dkt. 14 · p. 8. The case instead ended in the sales and liquidating plans described above.
On October 1, 2025, the official committee of unsecured creditors sued Oaktree entities, challenging the 2023 transaction as a fraudulent transfer and seeking subordination Dkt. 295. That fight was resolved by the December 2025 settlement described above Dkt. 514Dkt. 553 · p. 5.
Key timeline
| Date | Event |
|---|---|
| November 8, 2021 | TPI issues $350 million of preferred stock to Oaktree affiliates Dkt. 14 · p. 4 |
| Third quarter 2023 | Preferred equity exchanged into a $393 million senior secured term loan Dkt. 14 · p. 6 |
| August 11, 2025 | Chapter 11 petitions filed Dkt. 1 |
| August 13, 2025 | Interim DIP financing order Dkt. 73 |
| September 30, 2025 | Bid procedures order Dkt. 288 |
| October 1, 2025 | Committee sues Oaktree over the 2023 transaction Dkt. 295 |
| October 14, 2025 | Final DIP financing order Dkt. 373 |
| December 12, 2025 | Qualified bidder designated and auction cancelled for TPI Mexico V and VI Dkt. 521 |
| December 18, 2025 | Oaktree settlement approved Dkt. 553 |
| February 12, 2026 | Second auction cancelled Dkt. 667 |
| March 16, 2026 | ECP sale order Dkt. 778 · p. 1 |
| May 21, 2026 | TPI Mexico V and VI plan confirmed and Vestas Mexico sale approved; RemainCo disclosure statement conditionally approved Dkt. 929Dkt. 928 · p. 1Dkt. 927 |
| June 15, 2026 | TPI Mexico V and VI plan effective Dkt. 980Dkt. 1144 · p. 2 |
| June 30, 2026 | Final decree closes the TPI Mexico V and VI cases Dkt. 998 |
| July 1, 2026 | RemainCo liquidating plan confirmed Dkt. 1008Dkt. 1013 · p. 1 |
| July 2, 2026 | Plan effective; professional fee escrow funded Dkt. 1017 · p. 2Dkt. 1145 · p. 12 |
| July 9, 2026 | Final decree closes all cases but the parent; $5,000,000 distributed to senior secured term loan holders Dkt. 1025Dkt. 1145 · p. 13 |
| July 29, 2026 | Parent renamed TWD Composites, Inc. Dkt. 1144 · p. 2 |
| August 31, 2026 | Administrative expense request deadline Dkt. 1017 · p. 2 |
| September 21, 2026 | Omnibus claim objection procedures approved Dkt. 1129 |
| October 21, 2026 | Post-confirmation report for the quarter ended September 30 Dkt. 1145 · p. 2 |
| November 6, 2026 | GE and LM Wind file administrative expense applications Dkt. 1149 · p. 1Dkt. 1150 · p. 1 |
| November 17, 2026 | Revised proposed order on the first omnibus objection Dkt. 1153 · p. 2 |
| November 19, 2026 | Response deadline for the third omnibus objection, 5:00 p.m. Central Time Dkt. 1152 · p. 3 |
Frequently Asked Questions
Is TPI Composites still in business?
The bankrupt company is winding down. Its blade businesses were sold to a Vestas affiliate and to ECP Blade Holdings, LLC, and the former parent, now TWD Composites, Inc., is the only debtor whose case remains open Dkt. 929 · p. 58Dkt. 1013 · p. 39Dkt. 1144 · p. 4. GE’s November 2026 application says the ECP buyer is now known as TPI Composites Holdings, LLC Dkt. 1149 · p. 4. The filings do not describe how the buyers run the plants today.
What happened to TPIC stock?
Under the confirmed plan, existing equity holders neither receive nor retain any property unless all allowed claims are paid in full, and a Single Share is issued to the WindDown Agent as custodian Dkt. 1013 · p. 53. Senior secured term loan claims alone are allowed at no less than $456.8 million, and the September 30, 2026 report shows $5,000,000 paid on them and $0 on equity Dkt. 1013 · p. 52Dkt. 1145 · p. 7.
Will TPI’s unsecured creditors be paid?
They hold interests in the GUC Trust Dkt. 1013 · p. 52. Their main source of value is the Oaktree settlement, which shares Oaktree’s cash recoveries with them only above $89.5 million and caps their net share at $18.275 million Dkt. 553 · p. 5. Nothing had been paid on general unsecured claims through September 30, 2026, and claims objections are continuing Dkt. 1145 · p. 7Dkt. 1152 · p. 3.
Who bought TPI’s plants?
Vestas America Holding, Inc. acquired TPI Mexico V and TPI Mexico VI through their plan, with a related Mexico asset sale approved May 21, 2026 Dkt. 929 · pp. 42, 58Dkt. 928 · p. 1. ECP Blade Holdings, LLC bought the rest of the U.S. and Mexico business, with European and Latin American service entities, under a sale order signed March 16, 2026 Dkt. 778 · p. 1Dkt. 1013 · p. 39.
What is TWD Composites, Inc.?
It is TPI Composites, Inc. under its name as of July 29, 2026. As the WindDown Co, it handles claims objections and plan distributions and files the post-confirmation reports Dkt. 1144 · p. 2Dkt. 1145 · p. 2.
What happens next in the TPI case?
Responses to the third omnibus objection are due November 19, 2026 Dkt. 1152 · p. 3. The GE and LM Wind applications give 21 days from service to respond Dkt. 1149 · p. 1Dkt. 1150 · p. 1. The WindDown Co has not said when it will seek a final decree closing its own case Dkt. 1145 · p. 13.
Sources
- Dkt. 1Chapter 11 Voluntary Petition Non-Individual Fee Amount $1738 Filed by TPI Composites, Inc..Filed Aug 11, 2025Aug 11, 2025
- Dkt. 14TPI Composites First Day DeclarationFiled Aug 12, 2025Aug 12, 2025
- Dkt. 28Order Retaining Kroll as Claims AgentFiled Aug 12, 2025Aug 12, 2025
- Dkt. 37DIP and Cash Collateral MotionCited at p. 3 · Filed Aug 12, 2025Aug 12, 2025
- Dkt. 73Interim DIP Financing and Cash Collateral OrderFiled Aug 13, 2025Aug 13, 2025
- Dkt. 288Order Approving Asset Sale Bid ProceduresFiled Sep 30, 2025Sep 30, 2025
- Dkt. 295Adversary case 25-03761. Nature of Suit: (81 (Subordination of claim or interest)),(13 (Recovery of money/property - 548 fraudulent transfer)) Complaint by The Official Committee of Unsecured Creditors against Oaktree Fund Administration, LLC, Oaktree Power Opportunities Fund V (Delaware) Holdings, L.P., Opps TPIC Holdings, LLC, Oaktree Phoenix Investment Fund, L.P., Opps Xb TPIC PT, L.P., Opps XI TPIC Holdings, L.P., OCM Power V TPIC PT, L.P., OPIF TPIC CTB, L.P.. Fee Amount $350Filed Oct 1, 2025Oct 1, 2025
- Dkt. 373Final DIP OrderFiled Oct 14, 2025Oct 14, 2025
- Dkt. 514Emergency Settlement Approval MotionFiled Dec 10, 2025Dec 10, 2025
- Dkt. 521Notice of Qualified Bidder and Auction CancellationFiled Dec 12, 2025Dec 12, 2025
- Dkt. 553Order Approving Oaktree GUC SettlementFiled Dec 18, 2025Dec 18, 2025
- Dkt. 667Notice of Auction CancellationFiled Feb 12, 2026Feb 12, 2026
- Dkt. 778Order Approving TPI Composites Asset SaleCited at p. 1 · Filed Mar 16, 2026Mar 16, 2026
- Dkt. 903Second Amended Chapter 11 PlanCited at p. 23 · Filed May 18, 2026May 18, 2026
- Dkt. 915Second Plan Supplement (GUC Trust)Filed May 19, 2026May 19, 2026
- Dkt. 927Order Conditionally Approving Disclosure Statement and Solicitation ProceduresFiled May 21, 2026May 21, 2026
- Dkt. 928Vestas Mexico Asset Sale OrderCited at p. 1 · Filed May 21, 2026May 21, 2026
- Dkt. 929Plan Confirmation Order for TPI Mexico V & VIFiled May 21, 2026May 21, 2026
- Dkt. 931Amended Chapter 11 Liquidation PlanFiled May 22, 2026May 22, 2026
- Dkt. 937Notice of Plan Confirmation and Voting DeadlinesFiled May 26, 2026May 26, 2026
- Dkt. 980Notice of Plan Effective DateFiled Jun 16, 2026Jun 16, 2026
- Dkt. 998Final Decree Closing TPI MX CasesFiled Jun 30, 2026Jun 30, 2026
- Dkt. 1008Plan Confirmation Hearing MinutesFiled Jul 1, 2026Jul 1, 2026
- Dkt. 1013TPI Composites Confirmation OrderFiled Jul 1, 2026Jul 1, 2026
- Dkt. 1017Notice of Plan Effective DateCited at p. 2 · Filed Jul 2, 2026Jul 2, 2026
- Dkt. 1025Final Decree Closing CasesFiled Jul 9, 2026Jul 9, 2026
- Dkt. 1094First Omnibus Claims ObjectionFiled Aug 20, 2026Aug 20, 2026
- Dkt. 1129Omnibus Objection Procedures ApprovedFiled Sep 21, 2026Sep 21, 2026
- Dkt. 1140Objection to No Liability ClaimsFiled Oct 6, 2026Oct 6, 2026
- Dkt. 1144Omnibus Claims ObjectionFiled Oct 20, 2026Oct 20, 2026
- Dkt. 1145Quarterly Post-Confirmation ReportFiled Oct 21, 2026Oct 21, 2026
- Dkt. 1149GERNA Administrative Expense ApplicationFiled Nov 6, 2026Nov 6, 2026
- Dkt. 1150LM Wind Administrative ExpensesFiled Nov 6, 2026Nov 6, 2026
- Dkt. 1152Claims Objection NoticeFiled Nov 10, 2026Nov 10, 2026
- Dkt. 1153Objection Withdrawals and Proposed OrderFiled Nov 17, 2026Nov 17, 2026