Filing Background and Causes of Distress
Viridis Chemical produces renewable and low-carbon chemicals, including biobased ethyl acetate derived from corn-based feedstocks. Its principal asset is a chemical plant in Peoria, Illinois, relocated from Columbus, Nebraska during 2025.
Corporate origins and technology. Viridis was founded by its private equity sponsors — an affiliate of EIV Capital (EIV Viridis Chemical, LLC) and a minority investor — to acquire the plant assets and intellectual property of Prairie Catalytic, LLC, a subsidiary of Greenyug, LLC, which had developed the original patent for renewable ethyl acetate Dkt. 18. Prairie Catalytic completed construction of a chemical plant in Columbus, Nebraska in 2019, adjacent to an Archer Daniels Midland ethanol facility, but was unable to bring the plant to commercial operation because the ADM facility could not produce ethanol of sufficient purity. Viridis purchased Prairie Catalytic's assets out of a receivership in 2021 Dkt. 18 for $8 million in cash and a $4 million subordinated unsecured note. Through its proprietary Prairie Green catalytic process, the company produces ethyl acetate using 100% corn-based ethanol instead of hydrocarbon feedstocks. The main byproducts — water and hydrogen gas — are reused as heating fuel in the plant Dkt. 18, resulting in approximately 80% lower emissions compared to conventional ethyl acetate production. At full capacity, the plant is expected to produce roughly 100 million pounds of ethyl acetate per year Dkt. 18 and is designed to run continuously. The company has only two North American competitors and competes with a limited group of foreign importers.
Nebraska operations and relocation rationale. Following the 2021 acquisition, Viridis brought the Nebraska Plant to limited operations by sourcing railcar supply of corn-based, pharmaceutical-grade ethanol from BioUrja Renewables, LLC in Peoria. During that period, the company's renewable ethyl acetate was quality tested and approved for purchase by nearly 40 customers Dkt. 18 in the United States and Europe. However, the Nebraska Plant experienced persistent operational challenges and could not achieve sustainable, cost-competitive operations without access to lower-cost or on-site purified ethanol. The company announced the relocation to Peoria in November 2024 Dkt. 18, citing a projected margin expansion exceeding 20%, closer proximity to core customers in the Midwest and Northeast, and access to major rail lines and barge-navigable routes connecting to the U.S. Inland Waterways. The Peoria site is co-located with BioUrja's high-purity, corn-based ethanol plant, and the companies entered long-term agreements covering ethanol supply, utilities, cooling water, and waste-water treatment.
The First Day Hearing Exhibits Dkt. 18 describe a reconstruction project that was not feasible without new capital. The Peoria plant relocation involved moving major components from Nebraska to Illinois by summer 2025, but cost overruns and construction delays consumed available liquidity. The initial total budgeted cost of Peoria plant construction was approximately $26.7 million Dkt. 18, with Sterling Global Industries' contract scope estimated at roughly $14.9 million. The actual cost increased significantly: the company paid Sterling a total of $21.5 million Dkt. 18 from January 2025 through December 2025, well in excess of the original budget. Due in part to multiple replacements of Sterling's project manager, cost reports were inconsistent in frequency, content, and quality, and beginning in July 2025, Sterling presented invoices significantly higher than any forecast. Unforeseen additional costs included additional regulatory requirements associated with locating the plant in an urban area , unexpected equipment maintenance, increased transportation costs, and the imposition of tariffs on Indian steel imports. The company also decided to replace a key component — the dehydration system responsible for removing water from the ethanol stream — due to reliability issues at the Nebraska Plant. The replacement was contracted with an India-based company described as the only supplier in the world capable of manufacturing a dehydration system of the required size and specifications. Delivery of the dehydration unit was delayed by new tariffs and transportation logistics, leaving some pieces in shipping containers in a bonded warehouse at the port of entry in Houston. The plant cannot function without this key component . Market distress in the ethyl acetate and ethanol spread further reduced the project's economics. In the second half of 2025, the price difference between ethyl acetate and ethanol — known as the "spread" — fell by approximately 26% . Tariffs on imported equipment also pushed project costs higher . By the petition date, construction had been paused and the company was non-operational.
Prepetition restructuring steps. In December 2025, investors — including EIV Capital — flagged concerns, and the board appointed Mark McDermott Dkt. 18 as an independent director and sole member of a newly formed special committee. McDermott, a former restructuring lawyer with over three decades of experience at an international law firm, was delegated binding decision-making authority Dkt. 18 on matters constituting or reasonably likely to constitute a conflict of interest between Viridis and its related parties. The company engaged Carl Marks Advisors and paused construction to preserve remaining liquidity. In early February 2026, Viridis retained Vinson & Elkins LLP as legal counsel and expanded Carl Marks' role to include investment-banking services for strategic alternatives.